Egyptian manufacturer of low-voltage switchgear
Low-voltage switchgear that arrives with its paperwork.
Arabtech has been a certified ABB panel builder since 2007, manufacturing distribution boards, motor control centres, power-factor correction and enclosure systems in a 10,000 m² factory at 10th of Ramadan. Ratings, forms of separation and verification documents are published for every family — before you have to ask.
- ABB certified panel builder
- IEC 61439 assemblies
- up to 6300 A
- Form 2 – 4b
- 10,000 m² factory
Client
Arabtech for Electrical Industries
Factory
10th of Ramadan · Zone C5
Approved
ABB Panel Builder 2023
Standard
IEC 61439-1 / -2
What we build
Six families, all configured to order. Every one carries its ratings on the label.
-

Circuit Breakers
قواطع هوائية حتى 6300 A وقواطع علبة مصبوبة حتى 1600 A، ثابتة ومقبسية وقابلة للسحب، بسعة قطع حتى 200 kA.
-

Control Products
كونتاكتورات هوائية حتى 3000 A مع مرحّلات الحمل الزائد الحرارية، إضافةً إلى الملحقات، ومفاتيح فصل الحمل، ومفاتيح المصهرات، ومصهرات HRC، ومحوّلات التيار.
-

Enclosures IS2
كبائن IS2 الشاملة من ABB منصة مثالية لحماية وتركيب مكوّنات لوحات التحكم الصناعية. وتتيح مزايا IS2 سهولة التركيب والتصميم.
The register
Named projects, named contractors, named years. Filter the full register by sector.
We own the factory
Not a trading company. The boards are cut, folded, coated, assembled and tested on our own floor.
1991
Established as ABB distributor
2007
Certified ABB panel builder
10,000 m²
Production area
3,000 m²
Warehouse
200
Employees




The paperwork
Six current certificates. Every one downloadable, ungated — because a certificate behind a form never reaches a tender document.
| Certificate | Scope | Issued | Document |
|---|---|---|---|
| ISO 9001:2015 | Quality management | — | |
| ISO 14001:2015 | Environmental management | — | |
| ISO 45001:2018 | Occupational health & safety | — | |
| ABB Panel Builder | Authorised panel builder | 2023 | |
| EEHC | Egyptian Electricity Holding Company | — | |
| NOPWASD | Potable Water & Sanitary Drainage | — |
IEC 61439 design-verification certificates are not yet published. These are the documents consultants ask for first. The slots are built and waiting on the Approvals sheet — Arabtech must supply the type-test reports and the ASTA / KEMA documentation.
Trusted by contractors and consultants
العملاء


































معتمدون لدى الاستشاريين
















If you are writing the specification
A door of your own. Spec text you can paste, general-arrangement drawings, form-of-separation guidance and every verification document we hold.
Send the schedule, not an enquiry.
Upload your single-line diagram, load schedule or BOQ and our engineers return a compliant, itemised proposal. Attach nothing and we will still answer — it just takes one more round trip.
Response time is being set by Arabtech — the target is one business day, awaiting confirmation.
Accepted
PDF · DWG · DXF · XLSX · ZIP
Max size
25 MB per file
Response
Target — awaiting confirmation
Routed to
Engineering, by product family
Drop your SLD or load schedule
or browse — no account, no registration
Head office
Building 6, EDNC · Eastown, SODIC Offices
South 90 St., 5th Settlement, New Cairo
Factory
Industrial Zone C5, No. 3
10th of Ramadan City
Telephone






