ABB certified panel builder since 2007

  1. Home
  2. Request a quote

Request a quote

You already have a schedule of loads. Rather than compress it into a message box, build it here line by line — or attach the single-line diagram and let our engineers read it. Either way an application engineer prices the actual assembly instead of guessing at it.

  • Step 1 five fields
  • Step 2 entirely optional
  • no account, no registration
  • 25 MB per file

Response

Target — awaiting confirmation

Accepted files

PDF · DWG · DXF · XLSX · ZIP

Max size

25 MB per file

Routed to

Engineering, by product family

Office hours

Sun – Thu · 09:00 – 17:00 EET

If this is a failed board, do not use this form. A breakdown is a phone call, not a schedule. Go straight to the emergency service route or call +20 106 006 6221.

  1. 01 — Who you are
  2. 02 — What you need
Step 01 — Who you are

These five fields are everything we need to reply. Nothing beyond this step is required.

The proposal and its attachments are sent here.

Include the country code. We call before we quote anything unusual.

It decides who picks the enquiry up.

Step 02 — What you need

All optional. Every line you fill in removes a round trip; leave it all blank and we will simply call you.

The consultant writes the specification. Knowing who it is tells us which clauses the board will be judged against.

Your date, not ours. We confirm what is achievable in the reply.

The schedule

One line per board, exactly as it appears on your schedule of loads. Add as many lines as the project has.

Schedule of boards being requested. Each row is one line item.
Item Product family Description & rating Qty Form of separation Remove line item
01
02

Not sure of the form? Leave it on “advise me” — we will propose one against your specification.

PDF, DWG, DXF, XLSX or ZIP. Up to 32 MB per file, as many files as you need. A single-line diagram gets you a priced proposal in one pass instead of three.

Site constraints, a clause you are unsure we can meet, an approval that has to be in place.

A reply from an engineer, not an auto-responder.

Head office

Building 6, EDNC · Eastown, SODIC Offices
South 90 St., 5th Settlement, New Cairo

Factory

Industrial Zone C5, No. 3
10th of Ramadan City

[vc_row][vc_column][cz_contact_form_7 cf7="CF7 Quick Contact form" id="cz_17824" sk_label="margin-left:12px;" sk_messages="border-radius:20px;"][/vc_column][/vc_row]